Coordination failure · Global
CORSIA's first phase ends on 2026-12-31 and ICAO counted 40,650,719 tonnes of eligible emissions units issued and labelled as of 2026-07-28 — units from Council-approved programmes that must meet double-claiming criteria such as a host-country letter of authorization, while Assembly Resolution A42-22 assigns no body responsibility for how many units exist
CORSIA is the market-based measure of the International Civil Aviation Organization that requires growth in carbon dioxide emissions from international flights to be offset. In 2025 the 42nd ICAO Assembly reaffirmed it, in Resolution A42-22, as the only global market-based measu…
- Resolution status
- not confirmed
- Checked
- 2026-10-14
- Evidence type
- SecondaryPress reports and institutional documents
- Outlet
- icao-corsia-newsletter
- Authoring mode
- Derived from press reports
- Views
- 5
What is happening?
CORSIA is the market-based measure of the International Civil Aviation Organization that requires growth in carbon dioxide emissions from international flights to be offset. In 2025 the 42nd ICAO Assembly reaffirmed it, in Resolution A42-22, as the only global market-based measure applying to international aviation emissions. Its first phase runs from 2024 to 2026 and ends on 2026-12-31. Aircraft operators then have to cancel eligible emissions units to cover the obligation, with the cancellation deadline given in opened sources as December 2027 or January 2028 depending on the source.
The rule is in force and the obligation is running. What lags is the input the rule demands. An eligible unit only exists after a chain of separate decisions: the ICAO Council approves a crediting programme on the advice of its Technical Advisory Body, a host country takes action against double claiming, for example by issuing a letter of authorization, and a programme registry issues the unit and labels it as eligible. As of 2026-07-28 the ICAO dashboard counted 40,650,719 tonnes of units that had been issued and labelled this way, from 10 host countries.
How many units the first phase will need is not stated in any ICAO document opened here. Estimates from outside ICAO run from 100 to 150 million tonnes, attributed to ICAO by an environmental nonprofit, to 170 to 236 million tonnes in an airline industry association paper. Every one of those figures is larger than the dashboard total. Resolution A42-22, read in full, gives the Council the job of approving programmes and gives member states the job of building domestic implementation frameworks, and contains no paragraph that makes any body responsible for the quantity of units available.
Whose problem is this?
| Role | Who |
|---|---|
| Affected | Aircraft operators on routes between participating states, which carry the offsetting obligation · the participating states, 130 in 2026, which must implement the scheme domestically |
| Raised by | ICAO itself, through its 2025-07-25 letter to states urging faster issuance of authorization letters and a 2026-06 regional meeting conclusion repeating that call · an airline industry association, through meeting papers and a supply chart · an environmental nonprofit, through published analysis |
| Decides | The ICAO Council (which programmes are eligible) · host-country governments (whether to authorize units and make the corresponding adjustment) · programme registries (issuance and labelling) |
| Bears the cost | Aircraft operators, which must find units that other actors produce · host countries that authorize units, which take on corresponding adjustments under the Paris Agreement |
Operator counts differ between two ICAO documents: 690 in the 2025 reporting cycle according to a dashboard capture in a 2026-06 regional presentation, and 675 in the 2026-07 newsletter while submissions were still in progress.
Where does this problem end?
| Axis | This is the problem | This is not the problem |
|---|---|---|
| What | The decision chain that turns crediting projects into eligible units, from programme approval through host-country authorization to registry issuance and labelling, measured against the first-phase schedule | Whether CORSIA is the right policy, and whether offsetting helps the climate at all — those are value questions about the standard itself and are excluded |
| The environmental integrity or quality of individual units is excluded | ||
| Who | The Council, host countries and registries as roles in the chain | Whether any named project, host country or airline is complying is excluded — host-country concentration is described only as a distribution |
| Where | The international scheme as a whole | Disputes between CORSIA and regional measures such as the EU emissions trading system are a separate problem |
| When | First phase, 2024-01-01 through 2026-12-31, and its cancellation deadline | The second phase, 2027 to 2035, appears only as context |
The boundary sits on the chain rather than on any single actor because each link is held by a different body and none of them is breaking a rule by moving slowly.
What is the state now, and what should it be?
Now
| Indicator | Value | As of |
|---|---|---|
| Eligible units issued and labelled | 40,650,719 tonnes | 2026-07-28 |
| Host countries with labelled units | 10 | 2026-07-28 |
| Share from the largest single host country | about 61 percent, 24,963,214 tonnes, our division of two dashboard figures | 2026-07-28 |
| Units in the pipeline but not yet issued | not counted in the dashboard total | 2026-07-28 |
| Eligible programmes for the first phase | 10 | 2026-06 presentation, 2026-04 edition |
| Eligible programmes for 2027 to 2029 | 4 | 2026-06 presentation |
| Participating states | 130 | 2026 |
| States with offsetting requirements in 2027 | 134 | 2026-07 newsletter |
| Certified eligible fuel produced in 2024 | 181,263 tonnes | 2026-07 newsletter |
| Authorization letters compatible with CORSIA, per industry association count | 42, covering about 72 million tonnes including verified but not yet issued volume | 2026-08 |
Needs a new measurementthe target state: no ICAO document opened here states how many eligible units the first phase requires, nor sets any target for unit supply by a given date. ICAO has asked states to issue authorization letters expeditiously, in its 2025-07-25 letter and again in a 2026-06 regional conclusion, but that is a request about speed and carries no quantity. The demand figures in this dossier come from outside ICAO and are not used as a target here.
How big is it?
The measured quantity is supply already issued and labelled: 40,650,719 tonnes as of 2026-07-28. Every other quantity in this problem is an estimate from a non-ICAO source and they do not share a basis.
On demand, an airline industry association paper presented at a 2026-09 Asia Pacific meeting of civil aviation directors general put first-phase demand at 170 to 236 million tonnes, using the 2024 sector growth factor, and its 2026-09-18 supply chart said 200 to 250 million tonnes would be needed by January 2028. An environmental nonprofit post dated 2026-07-27 cited an ICAO estimate of 100 to 150 million tonnes, a figure it dates to 2025-07, and 880 to 1,350 million tonnes for the second phase.
On supply, the same association counted about 38 million tonnes usable for the first phase as of 2026-06, and about 72 million tonnes covered by 42 authorization letters as of 2026-08, describing a gap of about 150 million tonnes. The 72 million tonne figure includes verified volume not yet issued, so it is a different quantity from the ICAO dashboard total and the two should not be subtracted from each other.
Under what conditions does it arise?
1. Each link has a different owner. The Council approves programmes, a host-country government decides on authorization and the corresponding adjustment, and a registry issues and labels units. A unit is only usable when all three have acted. No link can compel the next one.
2. The host country carries a cost for authorizing. Authorizing a unit for international use means the host country makes a corresponding adjustment under the Paris Agreement, so the reduction is not also counted toward its own target. The industry association attributes slow issuance to uncertainty about corresponding adjustments and low awareness among finance ministries. That is the association reading, not a position stated by any host government.
3. The obligation has a calendar and the supply chain does not. The first phase ends on 2026-12-31 and cancellation follows by early 2028. Nothing in the chain is tied to that calendar. Supply is also concentrated, with about 61 percent of labelled tonnes from one host country as of 2026-07-28, so decisions by a small number of governments move most of the total.
4. The alternative compliance route is small. Operators can also reduce obligations with eligible fuels, but the dashboard records 181,263 tonnes of certified eligible fuel from 2024 production, and the industry association expects first-phase obligations to be met mainly with units.
What has been tried?
| Attempt | By whom | When | Result |
|---|---|---|---|
| Approval of eligible programmes | ICAO Council, on Technical Advisory Body recommendations | 2026-04 edition | 10 programmes eligible for the first phase |
| Letter urging states to issue authorization letters quickly, with the UNFCCC model form | ICAO | 2025-07-25 | A 2026-06 regional meeting in the North American, Central American and Caribbean region recommended expeditious issuance again |
| Capacity building under ACT-CORSIA | ICAO and member states | since 2018-07 | Reporting coverage reached 99 percent of emissions; no effect on unit supply is reported in the opened source |
| Alliance to help host countries issue authorization letters | An airline industry association | launched 2026-06-06 | About 50 organizations including 5 states as of 2026-06; 42 compatible letters covering about 72 million tonnes as of 2026-08, by the association count |
| Periodic review every three years | ICAO Council, under paragraphs 9(g) and 17 of A42-22 | from 2022 | Whether any review addressed first-phase supply is not stated in the opened sources |
Two of these act on the chain from the demand side and from the advisory side, and neither has authority over the link that host governments hold. That is why every attempt in this table takes the form of a request, an offer of help or a review.
What was found?
| Finding | Observed value | Evidence grade |
|---|---|---|
| Eligible units issued and labelled | 40,650,719 tonnes as of 2026-07-28 | high — ICAO newsletter dashboard, opened |
| Labelled units meet double-claiming criteria, for example a host-country letter of authorization | stated in the dashboard note | high — ICAO newsletter, opened |
| Host countries with labelled units | 10 as of 2026-07-28 | high |
| Share from the largest host country | about 61 percent as of 2026-07-28 | high for the two inputs; the share is our division |
| First phase dates | 2024 to 2026, ending 2026-12-31 | high — A42-22, read in full |
| Resolution text on unit quantity | no paragraph assigns responsibility for the quantity of units available | high for A42-22 itself; Annex 16 Volume IV and the eligibility criteria documents were not opened |
| Participating states | 130 in 2026 · 134 with offsetting requirements in 2027 | high |
| Eligible programmes | 10 for 2024 to 2026 · 4 for 2027 to 2029 | high — ICAO regional presentation, opened |
| Certified eligible fuel | 181,263 tonnes from 2024 production | high |
| First-phase demand | 170 to 236 million tonnes | medium — airline industry association estimate in an ICAO meeting paper |
| First-phase demand attributed to ICAO | 100 to 150 million tonnes, dated 2025-07 | low — cited by an environmental nonprofit; the ICAO source was not opened |
| Supply counted by the industry association | about 38 million tonnes as of 2026-06 · about 72 million tonnes under 42 letters as of 2026-08 | medium — different basis from the ICAO dashboard |
| Cancellation deadline | December 2027 in one source, 2028-01-31 in another | low — sources disagree and the Annex text was not opened |
| Aircraft operators | 690 or 675 | medium — two ICAO documents differ |
Why is it still unsolved?
Coordination failure — every link in the supply chain belongs to a different body, each acts within its own rules, and nothing ties their combined output to the date when operators must cancel units.
The Council can declare a programme eligible but cannot make a host country authorize anything from it. A host government can authorize units but carries the corresponding adjustment when it does, and that cost lands in its own national accounts rather than in the aviation scheme. Registries issue and label what has been authorized and nothing more. The operators that need the units hold none of these levers.
Resolution A42-22 divides the work exactly along those lines. It asks the Council to approve programmes, asks states to build domestic frameworks, asks ICAO and states to support capacity building, and asks the Council to facilitate the use of units that benefit developing states. None of those paragraphs makes anyone answerable for whether the total is enough. The periodic review exists, but the opened sources do not show it being applied to first-phase supply.
The industry association attributes slow authorization to uncertainty about corresponding adjustments and low awareness in finance ministries. That diagnosis comes from a party with a direct stake on the demand side, and no host government statement was found to confirm or contest it.
What observation would mean it is solved?
Candidates — (a) issued and labelled supply on the ICAO dashboard reaches a published estimate of first-phase demand before the cancellation deadline (b) ICAO publishes its own first-phase demand estimate alongside the supply dashboard, so the gap is stated on one basis (c) a document assigns a body responsibility for monitoring unit quantity against the compliance calendar.
(a) alone depends on which demand figure is chosen. The estimates opened here range from 100 to 236 million tonnes, so the same supply total could look sufficient or less than half of what is needed.
(b) alone measures the gap without closing it. A published ICAO estimate would end the dispute over the basis, but it would not oblige any host government to authorize anything.
(c) alone can exist on paper. A monitoring responsibility with no authority over host-country decisions would describe the chain without changing its speed. Read together, the three would show a measured gap, an owner, and a total moving toward it.
What is it connected to?
Fills with researchthe Paris Agreement Article 6 authorization and corresponding adjustment process in general, voluntary carbon market supply, the second CORSIA phase from 2027, eligible aviation fuel production, and the related corpus entries on shipping carbon pricing and the loss and damage fund. Relation type and evidence grade were not confirmed in this round.
What these sources do not say
- ICAO own first-phase demand estimate. No ICAO document opened here contains one. A search result pointed to an ICAO file on supply and demand projections, but it returned HTTP 403 and was not read. The sources do not say ICAO made no estimate; the opened range simply contains none.
- What happens if supply falls short. A42-22 sets out safeguards in paragraph 16 and periodic review in paragraphs 9(g) and 17, but no paragraph states an effect of a first-phase supply shortfall. The compliance provisions of Annex 16 Volume IV were not opened, so this is not a finding that such provisions are absent.
- Whether any other ICAO document assigns responsibility for quantity. A42-22 does not. Annex 16 Volume IV and the eligibility criteria documents were not opened.
- The exact wording of the double-claiming criteria. The dashboard note gives a letter of authorization as an example; the criteria document itself was not read.
- Whether ICAO has reconciled the differing demand and supply bases of the industry association figures. No source addresses it.
- The position of host-country governments. The reasons for slow authorization come from the industry association. A direct statement from any host government was searched for and not found.
- Sanctions for first-phase non-compliance by state. No source opened here describes them beyond a mention of domestic legislation in a law firm market note.
- Which date is the cancellation deadline. Opened sources give December 2027 and 2028-01-31, and none of them reconciles the two.
See the evidence
| Item | Source | Confirmation |
|---|---|---|
| Dashboard total of 40,650,719 tonnes issued and labelled as of 2026-07-28 · note that labelled units meet double-claiming criteria such as a letter of authorization and that pipeline units are excluded · 10 host countries and the largest single host total · 134 states with requirements in 2027 · 181,263 tonnes of eligible fuel · operator reporting status · rising share from developing-country hosts | ICAO, CORSIA Newsletter July 2026 | 2026-10-14 |
| First phase 2024 to 2026 · reaffirmation as the only global market-based measure · 130 participating states in 2026 · paragraphs 9(b), 9(g), 16, 17, 19(c), 19(f), 20, 21 and 23 · no paragraph on unit quantity | ICAO 42nd Assembly, Resolution A42-22 | 2026-10-14 |
| 10 eligible programmes for 2024 to 2026 and 4 for 2027 to 2029 · 690 operators · 99 percent reporting coverage · 2025-07-25 state letter and the 2026-06 recommendation on expeditious authorization | ICAO North American, Central American and Caribbean Office, regional meeting presentation 2026-06 | 2026-10-14 |
| Eligible units come from programmes the Council approves taking Technical Advisory Body recommendations into account | ICAO, CORSIA Eligible Emissions Units page | 2026-10-14 |
| Industry association estimate of first-phase demand at 170 to 236 million tonnes · about 38 million tonnes usable as of 2026-06 · barriers to authorization · first-phase obligations expected to be met mainly with units | International Air Transport Association (IATA), discussion paper to the 61st Asia Pacific DGCA conference | 2026-10-14 |
| 42 compatible authorization letters covering about 72 million tonnes as of 2026-08, including verified but not issued volume · gap of about 150 million tonnes · 200 to 250 million tonnes needed by January 2028 | IATA Economics, supply chart 2026-09-18 | 2026-10-14 |
| Launch of an alliance supporting authorization on 2026-06-06 · supply goal of 225 to 250 million · deadline given as December 2027 | IATA press release 2026-06-06 | 2026-10-14 |
| ICAO first-phase demand estimate cited as 100 to 150 million tonnes, dated 2025-07 · second-phase estimate of 880 to 1,350 million tonnes | Environmental Defense Fund, blog post 2026-07-27 | 2026-10-14 |
| Summary of authorization and corresponding adjustment requirements · cancellation deadline given as 2028-01-31 · domestic legislation examples | Norton Rose Fulbright, market update 2025-06 | 2026-10-14 |
| Trade press restatement of the industry association supply figures | Centre for Aviation, 2026-09 | 2026-10-14 |
| ICAO file on unit supply and demand projections, located by search | ICAO | URL not confirmed: automated fetch returned HTTP 403, the file was not read |
| Carbon market analytics report on CORSIA, 2026-06 | Sylvera | URL not confirmed: the file exceeded the 10 MB fetch size limit and was not read |
One primary ICAO decision text was read in full, Resolution A42-22. The ICAO newsletter, regional presentation and eligible units page were opened directly and carry the dashboard figures, programme counts and the authorization requests. Everything about demand, and the alternative supply counts, comes from an airline industry association, an environmental nonprofit, a law firm note and trade press. Those sources do not share a basis — the industry supply count includes verified but unissued volume, the dashboard does not, and the demand estimates range from 100 to 236 million tonnes — and the disagreement is left visible rather than resolved. Annex 16 Volume IV, which holds the compliance provisions, was not opened. This is a Path A output (research-based definition), so observation_refs is empty and provenance_mode: press-derived.
This table holds 12 evidence rows, 10 of which carry a source you can open · 5 distinct sources. How this table is made
People affected
Estimated range Not derivable
The reason and what is missing are listed under “What is missing” below
What is missing 3
Grouped by how it gets filled, not by block number — that axis is the only one that tells a reader what can be done next.
- SectionWhat is it connected to?
the Paris Agreement Article 6 authorization and corresponding adjustment process in general, voluntary carbon market supply, the second CORSIA phase from 2027, eligible aviation fuel production, and the related corpus entries on shipping carbon pricing and the loss and damage fund. Relation type and evidence grade were not confirmed in this round.
Fills with research
- SectionWhat is the state now, and what should it be?
the target state: no ICAO document opened here states how many eligible units the first phase requires, nor sets any target for unit supply by a given date. ICAO has asked states to issue authorization letters expeditiously, in its 2025-07-25 letter and again in a 2026-06 regional conclusion, but that is a request about speed and carries no quantity. The demand figures in this dossier come from outside ICAO and are not used as a target here.
Needs a new measurement - Derived valueThe affected population could not be derived
The parties carrying the obligation are aircraft operators and participating states, not a population of people. Opened ICAO documents count operators at 690 or 675 depending on the document, and no source links the unit supply gap to a count of people affected, so no chain of terms can be built without inventing one.
a count of people whose situation changes when eligible unit supply falls short of first-phase obligations; an ICAO first-phase demand estimate on the same basis as the dashboard supply total
Needs a new measurement
Voting and commenting require you to be signed in. Sign in from the account page
Comments
The comment was empty, so nothing was posted.
The comment exceeded the limit, so nothing was posted. We do not truncate and save.
You just posted a comment. Please try again in a moment.
The target comment could not be found, so nothing was posted.
You must be signed in to comment.
You have already reported this comment. Each person counts once — to withdraw it, use Cancel report under Reports you filed on the notifications page.
This report has already been reviewed. A judged report cannot be filed again or withdrawn.
No reason was chosen, or Other was picked without a note, so the report was not filed.
You cannot report your own comment or your own profile. Use Delete to take down your own comment.
Report received. Once 3 different people report it, the comment is hidden until review finishes — the outcome appears on your notifications page.
Voting and commenting require you to be signed in. Sign in from the account page
No comments yet.