Institutional gap · Australia
A 2026 national agreement funds disability supports outside the NDIS for one cohort — children aged 8 and under — and leaves the size, funding and start date for every other cohort undefined
On 2023-12-07 the independent review of the National Disability Insurance Scheme delivered its final report. The first of its 26 recommendations was to invest in foundational supports — a new layer of assistance for people with disability under 65 and their families, sitting out…
- Resolution status
- not confirmed
- Checked
- 2026-08-15
- Evidence type
- SecondaryPress reports and institutional documents
- Outlet
- not recorded
- Authoring mode
- Derived from press reports
- Views
- 14
What is happening?
On 2023-12-07 the independent review of the National Disability Insurance Scheme delivered its final report. The first of its 26 recommendations was to invest in foundational supports — a new layer of assistance for people with disability under 65 and their families, sitting outside the individualised budgets that the scheme funds. At the same time the National Cabinet agreed to bring annual growth in scheme costs down to 8 percent.
More than two years later that layer exists as a signed instrument. The Foundational Supports national agreement 2026-2031 was signed by all eight states and territories and by the Commonwealth. The Australian Capital Territory, the Northern Territory and Tasmania signed on 2026-02-02 and the remaining jurisdictions in January 2026; the Commonwealth signed on 2026-02-27. The agreement runs to 2031-06-30.
What the agreement actually funds and dates is one cohort: children aged 8 and under with developmental delay or autism or both and with low to moderate support needs, together with their families, carers and kin. The program is called Thriving Kids. Clause 6 describes it as the first stage of a staged rollout.
For everyone else the agreement records an absence rather than a plan. Clauses 6 and 49 to 51 provide that further cohorts are to be settled in separate bilateral agreements without amending the national agreement, and that the Commonwealth will supply four things at the earliest opportunity — a definition of the cohort, an estimate of its size, a budget quantum and a preferred start date. At signature none of the four had been settled for any cohort beyond the first.
The money is capped. Up to 10 billion Australian dollars over five years, split 50:50 between the Commonwealth and the states on a population basis. Of the Commonwealth share, at least 1.4 billion Australian dollars is allocated directly to states and territories for Thriving Kids, distributed on a population basis across ages 0 to 64.
Whose problem is this?
| Role | Who |
|---|---|
| Affected | People with disability under 65 who do not hold an individualised scheme budget, and their families and carers. Also the participants the Commonwealth intends to move off the scheme — about 160,000 by about 2030 on the reported target — who would need the tier that is defined for one cohort |
| Raised by | The independent review panel, which recommended the tier · disability representative organisations including People with Disability Australia · states and territories negotiating the bilateral schedules |
| Decides | The Commonwealth, which under the agreement supplies the cohort definition, the size estimate, the budget quantum and the start date · the eight states and territories, which deliver and co-fund · the National Cabinet, which set the cost growth target · the Parliament, which holds the scheme reform bill |
| Bears the cost | People who fall outside both systems, who pay privately or go without · states and territories, which hold the delivery obligation and half the funding · families and unpaid carers, who absorb what neither system reaches |
The party that must define the remaining cohorts is the same party that agreed to build the tier for them. Nothing in the agreement sets a date by which that definition has to arrive.
Where does this problem end?
| Axis | This is the problem | This is not the problem |
|---|---|---|
| What | The absence of a defined, funded and dated support tier for every cohort other than children aged 8 and under, in a system that has already agreed the tier is needed | Whether the scheme cost growth target is met, which enters here as background and not as the claim |
| The design of the Thriving Kids program itself, which is a separate question about the one cohort that was funded | ||
| Who | People with disability under 65 who are outside individualised scheme budgets | Aged care for people over 65, which is a different system with its own entitlement |
| Where | Australia, the national agreement and the bilateral schedules under it | Community disability supports in other countries were not examined |
| When | 2023-12-07, when the tier was recommended, through 2026-08-15 | Disability support policy before the review was not examined |
| Scale | Up to 10 billion Australian dollars over five years, of which at least 1.4 billion of the Commonwealth share is committed to one cohort | The total scheme budget and its rate of growth, which is a separate quantity |
| Which instruments | The national agreement, the bilateral schedules and the Thriving Kids program | Pre-existing state and territory disability services, which the additionality clause holds to a 2022-23 baseline and treats separately |
The boundary here runs between a support tier that has been agreed and the cohorts for which that tier has not yet been defined. Spending restraint inside the scheme is the background to that gap and not the gap itself, and this document uses it only where a source names it as a cause.
What is the state now, and what should it be?
Now
| Indicator | Value | As of |
|---|---|---|
| Foundational supports in force for cohorts other than children aged 8 and under | none | 2026-08-15 |
| National agreement signed | all eight states and territories and the Commonwealth | ACT, NT and Tasmania 2026-02-02 · remainder January 2026 · Commonwealth 2026-02-27 |
| Agreement expiry | 2031-06-30 | as signed |
| Cohorts with a defined size, budget and start date | one | 2026-08-15 |
| The funded cohort | children aged 8 and under with developmental delay or autism or both and low to moderate support needs, with families, carers and kin | 2026-02 |
| Cohorts deferred to later bilateral negotiation | all others, under clauses 6 and 49 to 51, with no amendment of the agreement required | 2026-02 |
| What the Commonwealth still owes for those cohorts | cohort definition, estimated size, budget quantum, preferred start date — to be provided at the earliest opportunity, with no date named | 2026-02 |
| Total funding cap | up to 10 billion Australian dollars over five years, split 50:50 on a population basis | 2026-2031 |
| Commonwealth funding tied to the funded cohort | at least 1.4 billion Australian dollars, distributed on a 0 to 64 population basis | 2026-2031 |
| Thriving Kids service start | partial from 2026-10-01, full national rollout 2028-01-01 | reported by the scheme news page, which could not be opened |
| Scheme participants with an approved plan | 774,456 | 2026-03-31 |
| Annual growth in scheme expenditure | 11.3 percent, down from 11.8 percent | 2026-03-31 |
| Cost growth target agreed by National Cabinet | 8 percent; some reporting says it has since been rebased to 5 or 6 percent | agreed 2023 · rebasing reported 2026-04 |
| Participant number the Commonwealth is working toward | about 600,000 by about 2030, against about 760,000 now | reported 2026-04 |
| Scheme reform bill | Senate committee reported on 2026-08-14 with a single recommendation that the bill be passed; not enacted | 2026-08-15 |
What it should be
The target state is defined in kind and not in quantity. The review asked for a tier open to every person with disability under 65 who does not hold an individualised budget, and the agreement itself names the four things the Commonwealth must still supply for those people. Three of the four are quantities and the fourth is a date, so the agreement is a description of what the target state must contain rather than a statement of what it is.
How big is it?
The quantities that bound this problem are published. The quantity that measures it is not.
| Quantity | Value | As of |
|---|---|---|
| Scheme participants with an approved plan | 774,456 | 2026-03-31 |
| People who reported needing help with core activities, being communication, mobility and self-care | 1,464,415, or 5.8 percent of the population | 2021 census |
| Share of people with disability who are not in the scheme | 86 percent | reported 2026 |
| Planned reduction in participants | about 160,000, from about 760,000 to about 600,000 | target for about 2030 |
| Concentration of the funded age band | about one in ten six-year-olds are participants, and people under 15 are just under half of all participants | reported 2026 |
| Government estimate of the number of children Thriving Kids covers | not found in any source opened here | 2026-08-15 |
| Estimated size of every other cohort | not yet provided, by the terms of the agreement | 2026-02 |
None of these quantities converts into a count of the people this document is about. They rest on different definitions, different base years and different age ranges, and combining them would produce a number that no source supports. The census figure is a self-report with no age limit and no relation to scheme eligibility. The participant count is an administrative total five years later. The planned reduction is a target rather than a measurement.
The term that would settle the count is the one term the agreement records as missing. Clause 51 has the Commonwealth supplying an estimated size for each further cohort at the earliest opportunity, and at 2026-08-15 no such estimate had been published for any cohort. The affected population is therefore recorded as not derivable, and the reason is not that research fell short but that the party responsible for the estimate has not produced it.
Under what conditions does it arise?
1. The tier was agreed in principle long before it was defined in detail. The recommendation arrived in December 2023 and the binding agreement took more than two years to sign. What was signed defines one cohort out of all the cohorts the recommendation named, so the interval between agreeing and defining did not close when the agreement did.
2. Addition without amendment removes the deadline. Clauses 49 to 51 let further cohorts be added by bilateral agreement without touching the national agreement, which means the instrument is complete as signed even though most of its intended coverage is empty. A schedule that can always be added later is a schedule that nobody is late on.
3. The funding is capped and the first cohort is first in line. With up to 10 billion Australian dollars over five years and at least 1.4 billion of the Commonwealth share committed to children aged 8 and under, every later cohort negotiates against the remainder rather than against the need.
4. Pressure inside the scheme runs on a clock and the tier outside it does not. Expenditure grew 11.3 percent against a target of 8 percent, a reform bill to tighten eligibility has a parliamentary timetable, and the number of people who will need a place outside the scheme rises while the place outside the scheme has one cohort in it.
5. Existing state services are held at a baseline. The additionality clause measures state and territory disability services against their 2022-23 level, so those services cannot be counted as the new tier and are not expected to grow into the gap either.
What has been tried?
| Attempt | By whom | What was done | When |
|---|---|---|---|
| Recommend the tier | Independent review panel | Final report recommended investing in foundational supports for people with disability under 65 who are outside individualised budgets, as the first of 26 recommendations, with supporting actions | 2023-12-07 |
| Set a cost growth target | National Cabinet | Agreed to bring annual scheme cost growth to 8 percent. Measured growth was 11.3 percent at 2026-03-31, and some reporting says the target has since been rebased to 5 or 6 percent | 2023, exact date not confirmed |
| Sign a national agreement | Commonwealth and the eight states and territories | Foundational Supports national agreement 2026-2031 executed, capped at up to 10 billion Australian dollars split 50:50, funding and dating one cohort and deferring all others to bilateral negotiation | January 2026 to 2026-02-27 |
| Stand up the first cohort | Commonwealth with states and territories | At least 1.4 billion Australian dollars of the Commonwealth share allocated on a population basis for children aged 8 and under with developmental delay or autism or both and low to moderate support needs, under the Thriving Kids program | 2026 |
| Examine the reform bill | Senate Community Affairs committee | Inquiry into the scheme amendment bill for securing the scheme for future generations was extended by eight weeks on 2026-06-23, and the final report on 2026-08-14 made a single recommendation that the bill be passed | 2026-06 to 2026-08 |
| Contest the reform bill | People with Disability Australia | Responded to the committee report by stating that the bill would cut real scheme funding by 10 percent by 2029-30 against 2026-27, cut 94 million paid care hours a year and threaten 51,600 jobs, and that safeguards were insufficient | 2026-08-14 |
Two directions have been pursued at once. One narrows the scheme on a legislative timetable, and the other builds the tier that people leaving the scheme would fall into, on no timetable at all for anyone over the age of eight.
What was found?
| Finding | Observed value | Evidence grade |
|---|---|---|
| A funded and dated foundational supports tier exists for cohorts other than children aged 8 and under | no | high — the agreement names one cohort and defers the rest |
| What the agreement fixes for other cohorts | nothing; definition, size, budget quantum and start date are all deferred to bilateral negotiation | high — clauses 6 and 49 to 51 |
| Deadline by which the Commonwealth must supply those four items | none; the agreement says at the earliest opportunity | high — agreement text |
| Total funding cap | up to 10 billion Australian dollars over five years, split 50:50 on a population basis | high — agreement text |
| Commonwealth funding tied to the funded cohort | at least 1.4 billion Australian dollars on a 0 to 64 population basis | medium — agreement text is clear, but other reporting cites a larger combined figure that could not be reconciled |
| Signing sequence and term | ACT, NT and Tasmania 2026-02-02, remaining jurisdictions January 2026, Commonwealth 2026-02-27, expiry 2031-06-30 | high — agreement text |
| Thriving Kids service dates | partial start 2026-10-01, full national rollout 2028-01-01 | low — the scheme news page returned an access refusal to automated retrieval and the dates come from a search summary |
| Scheme participants with an approved plan | 774,456 at 2026-03-31 | medium — quarterly report as summarised by a third party |
| Annual growth in scheme expenditure | 11.3 percent at 2026-03-31, down from 11.8 percent | medium — same summary |
| Cost growth target | 8 percent agreed in 2023 | medium — the originating ministerial release could not be opened |
| Rebasing of that target to 5 or 6 percent | reported | low — attributed to reporting rather than to any government document opened here |
| Participant number the Commonwealth is working toward | about 600,000 by about 2030, about 160,000 below the current level | medium — university newsroom |
| People who reported needing help with core activities | 1,464,415, being 5.8 percent of the population, in the 2021 census | high — national statistics agency |
| Share of people with disability who are not in the scheme | 86 percent | medium — single opened source |
| Age concentration of scheme participants | about one in ten six-year-olds are participants and people under 15 are just under half of all participants | medium — single opened source |
| Reform bill status | committee recommended passage on 2026-08-14, not enacted at 2026-08-15 | medium — industry commentary and an advocacy release; the parliamentary committee page could not be opened |
| Effects claimed for the reform bill | 10 percent real funding cut by 2029-30, 94 million paid care hours a year, 51,600 jobs | low — advocacy release citing modelling that was not obtained |
Why is it still unsolved?
Institutional gap — the tier that would close it has been agreed, signed and funded, and it covers one cohort out of all the cohorts it was agreed for.
The instrument is not missing. That is what makes this different from a promise that was never kept. A national agreement exists, all nine governments signed it, money is attached to it and a program under it will start taking children in October 2026. Everything that a reader would look for as evidence of action is present. What is absent sits inside the instrument, in the clauses that say the rest will be negotiated later.
The second part is that later has no edge. Clauses 49 to 51 allow further cohorts to be added by bilateral agreement without amending the national agreement, and the obligation on the Commonwealth is to supply the definition, the size, the budget and the start date at the earliest opportunity. An obligation phrased that way cannot be breached on any particular day. The agreement is therefore being complied with at every moment in which nothing happens.
The third part is that the money was capped before the coverage was defined. Up to 10 billion Australian dollars over five years is a ceiling set against a tier whose population has never been estimated in public. The first cohort has its allocation. Every cohort after it negotiates against what is left of a fixed number rather than against what the need turns out to be, which means that defining the cohorts later is also a way of deciding how much of the cap they can claim.
The fourth part is that the gap produces no record of itself. Nobody is refused foundational supports, because there is no place to apply and no eligibility test to fail. There is no queue, no waiting list and no rejection letter. A gap that generates no administrative artefact generates no number either, and a problem with no number is hard to put on any agenda against a scheme whose growth rate is measured every quarter.
What observation would mean it is solved?
Candidates — (a) bilateral schedules are published that name each remaining cohort with its size, budget and start date (b) services under the tier are counted as actually reaching people with disability under 65 who are outside individualised budgets (c) the number of people who fall between the scheme and the tier falls and keeps falling.
(a) alone counts paper. A schedule can define a cohort narrowly enough that the definition does more excluding than including, and a start date can sit beyond the term of the agreement that promised it. The first cohort shows how far a signed schedule can be from a delivered service, with a partial start eight months after signature and full national rollout nearly two years after that.
(b) is the observation that matters and the one nobody publishes. There is no count today of people receiving foundational supports outside the scheme, because for cohorts other than the first there is nothing to count. Until that series exists, coverage can only be inferred from spending, and spending against a capped allocation says how much was disbursed rather than how many people were reached.
(c) can move for the wrong reason. The number of people between the two systems falls if the tier arrives, and it also falls if scheme eligibility widens again, and it rises if the reform bill tightens eligibility while the tier stands still. Read alone it cannot distinguish a gap being closed from a gap being redefined, so it has to be read against (a) and (b) and against what the scheme did in the same period.
What is it connected to?
Fills with researchthe aged care system, which is where people over 65 with the same support needs are directed; state and territory disability services held to a 2022-23 baseline by the additionality clause; the early childhood education and health services that would deliver the first cohort program; and the scheme reform bill, which changes how many people arrive at this boundary. Relation type and evidence grade were not confirmed in this round.
What these sources do not say
- How many children the first cohort covers. No source opened here carries a government estimate of the number of children aged 8 and under who would be eligible for Thriving Kids, which is the one cohort that has money and dates attached to it.
- The size, budget and start date of every other cohort. This is not a silence in the sources but a silence the agreement records about itself, in clauses 49 to 51, and it is the reason the affected population in this document is not derivable.
- Any date attached to the four items the Commonwealth owes. The agreement says they will be provided at the earliest opportunity, and nothing opened here names a date by which they must arrive.
- How many current participants would face reassessment or lose eligibility under the reform bill. The departmental fact sheet and the parliamentary committee page both refused automated retrieval, so no official figure was confirmed.
- Whether the first cohort funding is 1.4 billion or about 4 billion. The agreement text opened here supports at least 1.4 billion from the Commonwealth share. Other reporting cites a larger figure that appears to combine Commonwealth and state contributions, and the difference could not be reconciled against a document.
- The modelling behind the advocacy figures. The claims of a 10 percent real funding cut, 94 million paid care hours and 51,600 jobs come from a disability representative organisation citing its own modelling, and that modelling document was not obtained.
- The originating document for the 8 percent target. The ministerial release that would carry the date and wording of the National Cabinet decision refused automated retrieval, so the target is reported here at second hand.
- The outcome of the parliamentary vote. The committee reported on 2026-08-14 and the vote falls after 2026-08-15, so no source could state a result.
See the evidence
| Item | Source | Confirmation |
|---|---|---|
| Recommendation 1 on foundational supports for all people with disability, published 2023-12-07 | Review of the National Disability Insurance Scheme, fact sheet | 2026-08-15 |
| Full text of recommendation 1 and its supporting actions | Review of the National Disability Insurance Scheme, recommendations and actions | 2026-08-15 |
| Foundational Supports national agreement 2026-2031 — signing dates, term to 2031-06-30, funding cap of up to 10 billion Australian dollars split 50:50, at least 1.4 billion of the Commonwealth share for the first cohort, clause 6 on staged rollout, clauses 49 to 51 on further cohorts | Federal Financial Relations, signed agreement | 2026-08-15 |
| 774,456 participants with an approved plan at 2026-03-31 · annual expenditure growth of 11.3 percent, down from 11.8 percent | Quarterly report of the scheme for the third quarter of 2025-26, as summarised by Insight PBS | 2026-08-15 |
| Participant target of about 600,000 by about 2030 against about 760,000 now · reporting that the 8 percent growth target has been rebased to 5 or 6 percent · implementation timing | UNSW Sydney newsroom | 2026-08-15 |
| 1,464,415 people, being 5.8 percent of the population, reported needing help with core activities in the 2021 census | Australian Bureau of Statistics | 2026-08-15 |
| 86 percent of people with disability are not in the scheme · scheme budget of 43.9 billion in 2023-24 against a projection of 58 billion by 2028 if the 8 percent target is met | The Conversation | 2026-08-15 |
| About one in ten six-year-olds are scheme participants · people under 15 are just under half of all participants · what the first cohort program is intended to mean for children and families | The Conversation | 2026-08-15 |
| Senate inquiry into the reform bill extended by eight weeks on 2026-06-23, with the bill not enacted as at 2026-06-28 | ICANReady, plan management industry commentary | 2026-08-15 |
| Senate committee final report due 2026-08-14 | Brevity, disability sector commentary | 2026-08-15 |
| Committee recommendation on 2026-08-14 that the bill be passed · claims of a 10 percent real funding cut by 2029-30, 94 million paid care hours a year and 51,600 jobs | People with Disability Australia, media release distributed through Medianet | 2026-08-15 |
| First cohort services beginning 2026-10-01 with full national rollout 2028-01-01 | National Disability Insurance Agency, news item on the first cohort program | URL not confirmed: automated retrieval returned HTTP 403, so the dates are taken from a search engine summary and graded low |
| The originating announcement of the 8 percent cost growth target | Ministerial media release, Department of Social Services | URL not confirmed: automated retrieval returned HTTP 403 |
| Government fact sheet on the reform bill, including the scale of reassessment | Department of Health, Disability and Ageing | URL not confirmed: automated retrieval timed out |
| Parliamentary committee page carrying the official record of introduction and passage through the lower house | Parliament of Australia | URL not confirmed: automated retrieval returned HTTP 403 |
| Policy analysis of foundational supports design, including comparison of candidate cohort sizes | Grattan Institute | URL not confirmed: automated retrieval returned HTTP 403 |
One primary document was opened directly. The signed national agreement is the source for the signing dates, the term, the funding cap and the split, the allocation to the first cohort, and the clauses that defer every other cohort — which is to say that the central claim of this document rests on the text of the instrument itself rather than on any account of it. Five sources could not be opened at all, and four of the five are government pages, which is why the start dates for the first cohort program, the reassessment scale under the reform bill and the originating document for the 8 percent target are all reported here at second hand and graded accordingly. Where opened sources overlap they agree on the participant total and on the growth rate, both of which reach this document through the same quarterly summary rather than through two independent readings. Where they diverge the divergence is left visible: the allocation to the first cohort appears as at least 1.4 billion in the agreement and as a larger combined figure in other reporting, and the cost growth target appears as 8 percent in the 2023 decision and as 5 or 6 percent in later reporting that names no document. The claims about the effects of the reform bill come from a disability representative organisation and are recorded as its position rather than as findings. This is a Path A output, research-based definition, so observation_refs is empty and provenance_mode: press-derived.
This table holds 16 evidence rows, 11 of which carry a source you can open · 9 distinct sources. How this table is made
People affected
Estimated range Not derivable
The reason and what is missing are listed under “What is missing” below
What is missing 2
Grouped by how it gets filled, not by block number — that axis is the only one that tells a reader what can be done next.
- SectionWhat is it connected to?
the aged care system, which is where people over 65 with the same support needs are directed; state and territory disability services held to a 2022-23 baseline by the additionality clause; the early childhood education and health services that would deliver the first cohort program; and the scheme reform bill, which changes how many people arrive at this boundary. Relation type and evidence grade were not confirmed in this round.
Fills with research
- Derived valueThe affected population could not be derived
The affected population here is people with disability under 65 who do not hold an individualised NDIS budget and for whom the foundational supports tier has not been defined. No source opened for this document counts that group, and the reason is recorded in the instrument itself: clauses 49 to 51 of the Foundational Supports national agreement 2026-2031 place an obligation on the Commonwealth to supply an estimated size for each cohort beyond children aged 8 and under, at the earliest opportunity, and at 2026-08-15 no such estimate had been published for any cohort. The missing term is therefore not a research shortfall but the finding of this document. Four quantities are available and each answers a different question. The 2021 census recorded 1,464,415 people, being 5.8 percent of the population, who reported needing help with core activities; that figure is a self-report, carries no age limit, and has no relation to scheme eligibility. The scheme quarterly report recorded 774,456 participants with an approved plan at 2026-03-31; that figure is an administrative count taken five years after the census and no opened source establishes that participants sit inside the census base, so the two cannot be set against each other. One opened source states that 86 percent of people with disability are not in the scheme, which describes a share of a population that the same source does not size. The Commonwealth target of about 600,000 participants by about 2030, against about 760,000 now, is a policy intention rather than a measurement, and the difference of about 160,000 describes people expected to leave a system rather than people counted as needing another one. Two further limits apply even if a term were found. Foundational supports are an under-65 tier while the census figure spans all ages, and the tier as recommended reaches people with disability who need support short of an individualised budget, which is a wider group than those reporting difficulty with communication, mobility and self-care. The errors therefore run in both directions and neither is quantified by any opened source.
A published estimate of the size of each cohort beyond children aged 8 and under, which the national agreement obliges the Commonwealth to provide and which had not appeared at 2026-08-15. Failing that, a count of people with disability under 65 who are outside individualised scheme budgets, broken out by age so that the aged care population is excluded. A third route would be a government estimate of the number of children aged 8 and under with developmental delay or autism or both and low to moderate support needs, which would size the one cohort that has been funded and would leave the remainder as an explicit residual. None of the three appears in any source opened for this document, and the two publications most likely to carry them are the departmental fact sheet on the reform bill and the policy analysis of foundational supports design, both of which refused automated retrieval during research.
Needs a new measurement
Voting and commenting require you to be signed in. Sign in from the account page
Comments
The comment was empty, so nothing was posted.
The comment exceeded the limit, so nothing was posted. We do not truncate and save.
You just posted a comment. Please try again in a moment.
The target comment could not be found, so nothing was posted.
You must be signed in to comment.
You have already reported this comment. Each person counts once — to withdraw it, use Cancel report under Reports you filed on the notifications page.
This report has already been reviewed. A judged report cannot be filed again or withdrawn.
No reason was chosen, or Other was picked without a note, so the report was not filed.
You cannot report your own comment or your own profile. Use Delete to take down your own comment.
Report received. Once 3 different people report it, the comment is hidden until review finishes — the outcome appears on your notifications page.
Voting and commenting require you to be signed in. Sign in from the account page
No comments yet.